CESU Study Agriculture Consumptive Use

The scope of work is to assess consumptive water use (i.e.

evapotranspiration; ET) from irrigated agricultural lands in the Upper Colorado River Basin.

The following tasks have been identified by Reclamation staff and the Principal Investigator as priority tasks needed for crop ET modeling

credit:


and remote sensing efforts in the Upper Colorado River Basin (Upper Basin):
1) Prepare ET demands model setup, calibration, and post processing steps for all subareas in the Upper Basin.

For example:
processing crop type data and developing crop masks; download and process soil data masked to the crop lands; calibration of basil crop coefficient (Kcb) curves to properly reflect historical planting; effective full cover, and harvest dates, and visualization of output for recognizing “good” or “bad” model runs or calibrations; and comparing model results (growing season start and end dates, ET rates, effective precipitation estimates, etc.) to previous studies.

2) Study ET demands with required input climate data, reference ET (ETo) calculations, and bias correction.

Gridded climate data extraction for areas of interest, and bias correction to agricultural station data is needed to ensure that historical climate and ETo estimates are representative of agricultural conditions.

3) Study quality assurance and quality control from agricultural weather station data and processes agricultural station data to compute ETo.

Compare gridded climate and ETo estimates to agricultural station based ETo to develop bias correction factors needed in task 2. 4) Develop rules by which crop classes such as 'pasture-high' and 'pasture-low' can be assigned to the grassland class which composes about 70% of the ag land in the UC Basin.

5) Evaluate the possibility of developing or evaluating existing maps of potentially irrigated lands.

6) Recommend a method for estimating shortages, winter time crop ET, and effective precipitation.

7) Compare potential crop ET estimates (e.g.

from Penman Monteith ET Demands and Blaney-Criddle) to eddy covariance estimates of crop ET.

8) Recommending unified remote sensing of actual crop ET, and potential crop ET consumptive use methods.

9) Develop draft and final reports of findings and recommendations.

10) Participate in stakeholder meetings and workshops.

Related Programs

Colorado River Basin Projects Act of 1968

Department of the Interior


Agency: Bureau of Reclamation

Office:

Estimated Funding: $71,921


Who's Eligible





Obtain Full Opportunity Text:
https://www.grants.gov

Additional Information of Eligibility:
This financial assistance opportunity is also open to all partners under any Cooperative Ecosystem Studies Unit (CESU) program.

CESUs are partnerships that provide research, technical assistance, and education.

If a cooperative agreement is awarded to a CESU partner under a formally negotiated Master CESU agreement, indirect costs are limited to a rate of no more than 17.5% of the indirect cost base recognized in the partner's Federal Agency-approved Negotiated Indirect Cost Rate Agreement.

Full Opportunity Web Address:


Contact:


Agency Email Description:


Agency Email:
dchorlton@usbr.gov

Date Posted:
2017-06-12

Application Due Date:
2017-06-26

Archive Date:
2017-07-26



Social Entrepreneurship
Spotlight



Exeter Sees Growth in Social Enterprise Sector


A partner at The Fruit Tree for Business LLP and co-founder of ESSENCE, Lorna Turner, discusses why Social Enterprise Day is a good time to celebrate Exeter’s thriving social enterprise scene.






More Federal Domestic Assistance Programs


Affordable Care Act Medicaid Emergency Psychiatric Demonstration | Hazardous Waste Management Grant Program for Tribes | Rural Development Multi-Family Housing Rural Housing Voucher Demonstration Program | Measurement and Engineering Research and Standards | Fisheries Disaster Relief |  Site Style by YAML | Grants.gov | Grants | Grants News | Sitemap | Privacy Policy


Edited by: Michael Saunders

© 2004-2025 Copyright Michael Saunders