The overall Phase III main objective is to validate safety and reliability performance of the L-WHRS-retrofitted locomotive during commercial operations.
The results of retrofitting locomotive engines with the L-WHRS can be summarized as:
Decreased operating cost, increased engine efficiency,
increased on-board electric power rating, and increased safety of operators and the general public by reducing pollutant emissions